The sanctioned remuneration is Rs. 25,500 - 29,200 (Level-4) under the 7th Central Pay Commission framework, accompanied by standard Central/State allowances including Dearness Allowance (DA), House Rent Allowance (HRA), and National Pension System (NPS) benefits.
What is the official application deadline?
The confirmed deadline for online application registration and fee settlement is 2026-09-30. Candidates are urged to finalize submissions in advance of the deadline.
How to verify authentic notification circulars from CRCBHOPAL Authority?
All official notifications and gazetted circulars are published directly on the verified sovereign domain crcbhopal.nic.in. Always cross-check notice references against primary government bulletins.
Explore verified public authorities and related career tracks across the national network:
Vendors must obtain a valid Digital Signature Certificate (DSC) and register on the GeM portal or CPPP to access tender documents and participate in the electronic bidding process for CRCBHOPAL.
2
A pre-bid meeting will be conducted to address technical queries and scope clarifications, with all amendments or corrigenda published on the portal to ensure transparency for all prospective bidders.
3
Bidders must submit a two-cover system comprising a technical proposal detailing methodology and credentials, and a separate financial bid (BoQ) to ensure objective evaluation of technical competence before price disclosure.
4
The technical committee evaluates proposals against pre-defined criteria; only technically qualified bidders proceed to the financial opening stage where the lowest responsive bidder (L1) is identified for contract award.
5
Upon successful financial evaluation and approval by the competent authority, the CRCBHOPAL Authority issues the Letter of Award (LoA), initiating the formal contract signing and performance security submission process.
Technical Qualification Matrix & Due Diligence Standards
Bidders participating in Strategy must satisfy the multi-tiered technical, financial, and statutory qualifying covenants detailed below:
Evaluation Benchmark
Mandated Technical & Financial Covenant
Statutory Benchmark
Average Annual Turnover of at least 30% of the estimated contract value during the last three financial years, supported by audited balance sheets and profit and loss statements.
Statutory Benchmark
Successful completion of at least one similar strategy consultancy project for a government entity or PSU, evidenced by copies of work orders and satisfactory completion certificates.
Statutory Benchmark
Mandatory possession of valid GSTIN, PAN, EPF, and ESI registrations, along with a valid Labor License, ensuring full compliance with Indian statutory and labor welfare regulations.
Statutory Benchmark
Exemption from EMD and prior turnover requirements for registered MSMEs and Startups as per Rule 170 of GFR 2017 and the Public Procurement Policy for Micro and Small Enterprises.
The contract valuation for the Strategy consultancy project must be derived from a realistic cost estimate based on market research. Per GFR 2017, an EMD of 2% of the estimated value is mandatory to ensure bid seriousness, though MSMEs are exempt under Rule 170. The Performance Bank Guarantee (PBG) is set at 3-5% of the contract value, to be submitted within 15 days of the Letter of Award to safeguard against non-performance. A non-refundable tender fee is typically waived on GeM, but if offline, it must be submitted via DD. The Liquidated Damages (LD) clause is strictly capped at 0.5% of the contract price per week of delay, with a maximum ceiling of 10% of the total contract value. This structure ensures financial discipline and protects the CRCBHOPAL Authority from potential project slippages while maintaining vendor accountability throughout the engagement lifecycle.
General Conditions of Contract (GCC) & Integrity Compliance
The contract adheres to the General Financial Rules 2017, incorporating an Integrity Pact to ensure transparency. Dispute resolution is governed by the Indian Arbitration and Conciliation Act, 1996, with the venue fixed at Bhopal. Payments are structured on a milestone-based billing schedule linked to specific deliverables. A Defect Liability Period (DLP) of twelve months applies to the strategy outputs, ensuring the consultant remains responsible for rectifying errors. All statutory deductions, including TDS and GST, will be withheld as per prevailing tax laws, and the contract remains subject to audit by the Comptroller and Auditor General of India.
Procurement & Bidding FAQs — Strategy
Are Joint Ventures (JV) permitted to participate in this tender?
JVs are permitted provided the lead member meets at least 50% of the technical and financial criteria, and the agreement is legally notarized.
What is the acceptable format for the EMD Bank Guarantee?
The EMD Bank Guarantee must be issued by a scheduled commercial bank in the specific format provided in the tender document, valid for 45 days beyond bid validity.
What is the standard bid validity period for this procurement?
The bid validity period is 180 days from the date of technical bid opening, during which the rates quoted by the bidder must remain firm.
Is there a Price Variation Clause (PVC) applicable to this contract?
No, this is a fixed-price contract. No escalation in rates will be entertained due to changes in market conditions or input costs during the contract term.
How are technical evaluation marks calculated?
Technical evaluation follows a Quality and Cost Based Selection (QCBS) or Least Cost System (LCS) model, where bidders must score a minimum of 70% to be technically qualified.
Can a bidder withdraw their bid after submission?
Bidders may withdraw or modify their bids before the deadline for submission; however, withdrawal after the deadline results in the forfeiture of the EMD.